Site Topics

#1642: TVOS Meeting January 28, 2010 Agenda

For Visitors

Fri, 01/28/2000 - 14:00
Meeting to be held at High Country Lodge
January 28, 2010
2PM
Black Diamond

Turner Valley Oilfield Society
A G E N D A
January 28, 2010
2:00 PM
High Country Lodge, Black Diamond

Meeting called to order

#1641: Alberta Petroleum Discoveries 2010 History Calendar - Book

For Visitors | Oil Fields
For Sale - 2010 History Calendars $20.00 each Makes a great Christmas present for those history buffs on your list Turner Valley is presented on several pages of the calendar Contact us at:

#1639: TVOS Meeting November 26, 2009

Agenda
Turner Valley Oilfield Society
A G E N D A
November 26, 2009
7:30PM
Town of Turner Valley

Meeting called to order

Approval of Agenda

Approval of Minutes of May 28, 2009

Old Business:
Driving Tour Booklets

#1638: Horton Spheres

Gas Plant | Gas Plant Reno
picture taken by Maureen Nelson May 2009

#1637: Horton Spheres Reclaimation

Gas Plant | Gas Plant Reno
work being done to Horton Spheres May 2009 picture taken by Maureen Nelson

#1627: Royalite (Dingman) #2 Operations Update September 8, 2009

For Visitors
  • On August 31, the ERCB notified Lionhead Engineering that the downhole operations have been reviewed. The ERCB has indicated the well has been satisfactorily abandoned.
  • On September 8, the well was tested for the presence of gas. No gas was detected in the well. Tests were also conducted to determine if any gas was seeping through the ground near the well head. No gas was detected. The tests were witnessed by representatives from the ERCB.

#1626: Turner Valley Oilfield Society Annual General Meeting

For Visitors

Thu, 09/24/2009 - 19:30
Turner Valley Oilfield Society
Annual General Meeting
September 24, 2009
Flare N Derrick
7:30 PM
A G E N D A

Meeting Called Turner to Order

Adoption of Agenda

Approval of Minutes from September 25, 2008

#1625: Royalite (Dingman) #2 Operations Update August 17, 2009

For Visitors
  • The well has been cleaned out to the planned casing set depth. Casing will be installed August 18 and cemented to surface.
  • A caliper log indicated multiple sections of old casing are in the well. This resulted in the difficulty of cleaning out the well.

#1624: Royalite (Dingman) #2 Operations Update August 14-16, 2009

For Visitors
  • continued to clean out well in preparation of logging and setting casing. Continue to get shale and pieces of metal circulated back to surface
  • the seepage area gas has declined to no measurable flow at this time. The area continues to be monitored.

#1623: Royalite (Dingman) #2 Operations Update August 13, 2009

For Visitors
  • Continue to clean out well bore prior to running and cementing casing.
  • Pieces of metal and shale are being cleaned out of the well.
  • The seepage area gas has declined to no measurabel flow at this time. The area continues to be monitored.