Royalite (Dingman) #2 Operations Update May 28, 2009

For Visitors
Work is being conducted to prepare the site for re-abandonmnet operations. Activities include:
  • Site preparation work was started on Monday May 25
  • Site access controls are in place
  • Monitor for H2S at exhaust port of scrubber barrel with 4 head monitor and there was non present
  • Piled fence posts neatly and levelled site
  • Marked 3 meter set back for equipment placement on site as determined by Geo Survey
  • Water samples were collected today by Stantec at Well #7
    • Stantec also collected 3 water samples from the river with 1 upstream of site, 1 directly parallel with the site, and 1 dowstream of the site
  • Site visit from ERCB was positive
  • 3 air monitoring stations are in place. Monitoring results can be accessed on-line at: http://dashboard.globaleye.ca Logon ID: turnervalley Password: tv
  • Lionhead's 24 Hour Emergency Phone number is: 1-888-306-3817