Royalite (Dingman) #2 Operations Update May 27, 2009

For Visitors
Work is being conducted to prepare the site for re-abandonment operations. Activities include:
  • Site preparation work was started on Monday, May 25th
  • Site access controls are in place
  • Site inspected by drilling rig contractors for sizing requirements for future operations
  • Continue to prepare piping and geomembrane to contain all gas and odor elimination through the Geocomposite system
  • Installed Geocomposite material
  • 3 air monitoring stations are in place